4 Seat El Jefe | Polaris Pro R Side by Side Comparison
Speed UTV Design Presentation No. 106
Speed UTV Design Presentation No. 105
Speed UTV Presentation No. 103.
Speed UTV Design Presentation
Recorded Live from the fab shop
Live with Todd Romano. Speed UTV Live Presentation 104
Speed UTV Presentation No. 103
Speed UTV Presentation No. 102
Speed UTV Presentation No. 101
Episode 100. Designed for Earth.
Speed UTV Presentation No. 99.5
Speed UTV Live Presentation No. 99
Speed UTV Presentation No. 98
Speed UTV Design Presentation No. 97
Speed UTV Live Presentation No. 96 – Live with Robby Gordon
Speed UTV Live Presentation No. 95 – Live with Robby Gordon
Speed UTV Live Presentation No. 94 (Uploaded from Facebook)
Speed UTV Live Presentation No. 93 – Live with Robby Gordon
Speed UTV Live Presentation No. 92 – Live with Robby Gordon
Speed UTV Live Presentation No. 91 – Live with Robby Gordon
Speed UTV Live Presentation No. 90 – Live with Robby Gordon
Speed UTV Live Presentation No. 89 – Live with Robby Gordon
Off-Road Hall of Fame inductee Robby Gordon shares the art of going fast in the dirt in a SPEED UTV design presentation series.
The SPEED UTV is designed by off-road racing veteran Robby Gordon to provide high performance and durability on any terrain. The full tube frame is triangulated and reinforced with upper and lower “spines”, making it structurally sound and resistant to damage.
Suspension and steering components are made with double-shear bolts and forged aluminum spindles, while the front bulkhead and diff are constructed from aluminum for added strength. The suspension geometry has been designed to minimize bump steer, ensuring a smooth and stable ride.
The SPEED UTV also features billet aluminum hubs and a self-leveling rear suspension for improved handling. With these features, the SPEED UTV is well-equipped to handle the demands of off-road racing and provide a thrilling driving experience.
Speed UTV will deliver the best sport utility terrain vehicle.